Going from 0.4mm to 0.6mm; does changing nozzles require calibration?
When I went from 0.4mm to 0.2mm and back to 0.4mm I did calibrate each change on the P2S. Just wondering if that is necessary?
Going from 0.4mm to 0.6mm; does changing nozzles require calibration?
When I went from 0.4mm to 0.2mm and back to 0.4mm I did calibrate each change on the P2S. Just wondering if that is necessary?
It is a best practice, to calibrate after changes .
Thanks! I assumed correctly for a change ![]()