Does changing nozzles require calibration?

Going from 0.4mm to 0.6mm; does changing nozzles require calibration?

When I went from 0.4mm to 0.2mm and back to 0.4mm I did calibrate each change on the P2S. Just wondering if that is necessary?

It is a best practice, to calibrate after changes .

Thanks! I assumed correctly for a change :wink: