Here at work we have an H2D equipped with two AMS Pros and an HT. It was all bought on the R&D budget, as was all the filament I’ve been using. Now I am starting to print the occasional part for our production department, but to get the parts into our inventory control system I need to cost them.
The cost of the filament is obvious–grams used per print times cost per gram of the filament.
What I don’t know is how to cost machine time. There is obviously electricity used, but that is “overhead” anyway. I’m an R&D mechanical engineer and know my hourly cost, but that is negligible in starting a print that is already set up. I’m thinking that the largest realistic machine cost per part will be in the depreciation of the machine.
I’d appreciate any guidance/tips on how to realistically cost parts I make. As of now, they are officially “zero cost parts” that magically appear on the engineer’s desk and are gifted to production…
If you want direct cost, amortize the price of the printer over a nominal expected lifespan in hours.
Electricity should be factored in - we certainly do so (indirectly).
So if you have a $2000 machine that’s nominally going to last 4,000 hours, 50 cents an hour plus maybe a dime in power per hour times print hours + filament value.
I use 10k hours of lifetime bringing the machine to salvage value, and use that as deprecation cost. In reality my A1’s still have lots of life left in them at 10k, and they go off to do other projects, but that specific model is seriously well built and IMO is an outlier.
My a1’s start at $299 and die to scrap value which I deem $50.
$249/10000 = ~$0.03 per print hour. I usually hold the number at $0.10 for minor profit and to pay for minor refurbishment along the way. A nozzle here, a plate there, etc.
If you pay electricity from a utility, youll want to directly factor that in too. A1’s use about 100-130w avg per hour depending on bed. My math is $0 since I use solar but you’ll want to figure that out.
When you do your filament math, IMO use retail pricing even if you got a better deal this time.
And IMO count a 1kg spool as 900g, if you’re in excel anyways, just apply the math. Factors out the running of tests, the odd failure, the first layer problem that you restart, the unwound part you had to snip off, etc
Thank you, @Eponymous . I am asking here becuase I have gotten blank looks from production. If it was a part machined from aluminum or Delrin, they can handle that because they buy the raw material and have it machined in our machine shop that is already set up for costing.
But this is brand new–R&D department so far has not made stuff for production so there is no precedent.
I’m not sure which industry you work in, but speaking from my experience in the industrial sector, I would suggest taking the final calculated cost per unit and adding a 30% margin on top. Yes, a margin to pay can also be directed toward one’s own company - not just customers.
Why? Because electricity isn’t going to get cheaper, filament prices can fluctuate, and you also have spare parts, maintenance, and other running costs to consider.
This approach will save you a lot of discussions down the road. For example, imagine having to announce a few months from now that your filament supplier has increased their prices. With that additional 30% built in from the start, you already have a buffer to absorb these kinds of fluctuations over the coming years.
I have seen figures from 5,000 hours to 25,000 hours and it all seems to be people’s opinions either way. From a business standpoint I would assume the worst case unless you are trying to cut margins razor thin.
A print farm is a very different scenario than a printer sitting in the corner of an engineering department at a company that does not do printing as a main service, and in that situation I would base in on number of years until you guys upgrade it.
I have not seen figures for the nominal lifetime of an H2D. Mine has 4,300 hours and still works fine.
For print farms, the internet says majority of their “per print” costs are labour, followed by filament. I can’t really give you detailed numbers as I don’t run a farm. This doesn’t count fixed expenses like office buildings.
However it sounds sensible. If you had to replace an h2d every 3 years, it would still cost far less than you pay your printer tech in salary.
Thank you, @Bullocks . Of the three it sounds like the depreciation is the main number I’m missing. Now I have two supplied numbers, 4k hours and 10k hours, which give almost a 3:1 difference in depreciation cost. Are there realistic lifetime numbers (even if anecdotal) available? I would include the two AMS’s and the HT even if they aren’t used on a specific print, because otherwise I’ll be needing to charge for engineering calculation time on top of everything.
Another idea, why not get a quote from an actual print farm, for a part similar to yours, and just use that as a baseline? since they have to turn a profit, you have a margin for error or cost savings built in.
I use PCBWay; you just upload an STL and they send a price instantly.
Average of electricity cost and expected maintenance. Then you can throw in profit (I based mine around prices from a few 3d printing services like xometry and PCB way)
For filament cost, I simply take the cost of a spool and divide it into cost per gram.
Oh. Wow. I didn’t realize it was that recent. I’m pretty much of a printing newbie, having a Neptune 4 Pro at home (which I took to work as proof-of-concept to convince the boss of the usefulness of on-site 3D printing)
As an aside, I didn’t mention soft costs at all but depending on your relationship with your employer they may have different ideas of assigning labor/time value into those products. Your labor costs might be accounting for other value already, they might want to charge sqft rent on the space needed for production, the compute cost of your workstation, and blahblahblah. I think if you provide them with your best math on hard cost breakdown, a quote from PCBway, and a number in the middle that feels right, you’ll be on a good path.
Will need some adjusting. My formula is based around P2Ss.
I think it is a safe assumption to get 10k out of a H2D. That is just my baseline, like saying you should expect 150k miles out of a car. But better to go lower and build in some buffer.
Then the cost of maintenance is more built around experience than anything (and guessing). For example, you would expect to go through a few nozzles and build plates, then you have lubricants, extruders, sensors, etc.
That is a good suggestion. The first particular part I’m proposing to make (and have already made 16–they are sitting on the shelf in my office) is the only current FDM part in our system–a TPU air duct that a local job shop was charging $82.99 each for, and poor quality. The ones I have printed have a direct material cost of $0.60 and it took me 5h30m to print a set of 4 and are night-and-day difference in quality.